List of the necessary tools.
The tools required for the unpacking and installation of this product are as follows.
| Name | Part code | Description | Related Operations |
|---|---|---|---|
| Gloves | - | For protection. | General operations. |
| Cutter | - | To cut tape, etc. | General unpacking operations. |
| Phillips (+) screwdriver | - | To set and remove parts, etc. | General installation operations. |
| Stubby driver | - | Saddle Unit Installation | Saddle Unit Installation Procedure |
| Tweezers with narrow tips | - | To remove covers parts. | High Capacity Unit Installation Procedure |
| Coin | - | To set coin screws. | Caster Table Installation Procedure |
| INCLINOMETER,ASSY.,GWM,KD | 1941886 | To check the inclination of main unit (Only for AM-M5500) | How to use an Inclinometer ASSY |
The following parts, which are removed when unpacking the product, should not be discarded but kept as they will be needed when the product is transported.
- Main Unit
- Ink Supply Port Cap
- Cap transport parts
- Right Door Transportation Part
- Head Transport Fixing Parts
- ADF/SCN support part
- Cushioning
- Floor Finisher
- Protective material for inside
Protective material for paper exit section
- Protective material for exterior parts
ADF/SCN support part
- Inner Tray
- ADF/SCN support part