Periodic Maintenance
Periodic maintenance is needed in this product to secure the product life (600,000 pages).
Periodic Maintenance
| Items | Overview |
|---|---|
| Replace the Ink System Assy | Ink System Assy is replaced as correspondence to Pump life of Ink System Assy wears. |
| Cleaning the PF Scale | The PF scale cleaning is executed as correspondence to the PF scale reading defective by the ink mist accumulation of the PF scale. |
| Readjust the PG Adjust Cam | As the CR Unit bearing wears, the PG value is changes. Move the cam one notch upward as correspondence to the PG value changing. |
| Replace the Driven Roller | Driven Roller is replaced as correspondence to the Driven Roller wears. |
| Attach the Grease to CR Shaft | As bearing part of Carriage Unit deteriorates, the load on Bearing part of Carriage Unit increases. As a countermeasure to the above, clean the CR Shaft and applying the new grease. |
|
Degradation of Paper Feed Roller deteriorates the accuracy of Paper Feed. As a countermeasure, readjust the paper feed adjustment items. *Menus that require performing are packaged into the "reguiar maintenance after performed menu." |
Periodic maintenance operation flow
Perform the periodic maintenance operation according to the following operation flow.
